Version 0.1.0 takes shape
Pack construction is underway with worldgen changes, bunker placement, performance tuning, and an SPH water VRAM investigation at the center of the first-alpha push.
By ThunderVersion 0.1.0
Open transmission Engineering reports
These are active technical records: the problem, current evidence, work in progress, and the gate that decides when a system is ready to move.
2 records available
Pack construction is underway with worldgen changes, bunker placement, performance tuning, and an SPH water VRAM investigation at the center of the first-alpha push.
Survivor logs and gallery slides are becoming data-driven so future updates are less annoying to make.
Try clearing one or more filters.